A GMP compliance manufacturing site
Established in 2006, and started into steam by the end of 2008; Occupation area: 46,300 m2; floor space: 33,597 m2; Total Employees: 180; Experienced in commercializing biocatalysis process.
Production cabability and capacity
Chemical production units:
165 reactors (50L~5000L)
Temperature range: -15°C to 220°C
Pressure range (Hydrogenation reactor): <100 kgf/cm2
Waste water: 300 ton/d; Waste gas: 15,000 m3/h by RTO
Have well organized QA/ QC system, all the employees were well trained about the GMP guideline. Got the GMP certificate issued by CFDA in 2015

Fermentation units:
Capacity 150 M3 (200 L to 30 M3 fermenters)
One dedicated extraction/purification workshop:Homogenizer, Pressure Filter, Centrifuge, Vacuum dryer etc.
Cold room: 50 M3 (2-8°C)